Galleria Mall

Galleria Mall
London
Project Description
  • Completed 2007
  • 73,400 sq. ft. roof replacement
  • Built Up Roof System
  • Fully tapered roof design
  • Downtown London with very limited access
  • Occupied facility, maintained public access
  • Winter conditions
  • Co-ordination with GC and other trades
Project Details
ClientGalleria Mall
Date2007