Solstice 2 Residence, Guelph

  • Completed 2016
  • 18,500 sq. ft. new construction
  • Co-ordination with GC and other trades
  • Limited access to site
  • 6-storey high-rise
  • Included walk out patio roof deck

Philip Street Blair House

  • Completed 2015
  • 12,500 sq. ft. new construction
  • High-rise building (24 stories)
  • Small canopies at various levels
  • Limited access to site
  • Roof system adjusted to suit building

Royal Canin, Aberfoyle

  • Completed 2008, 74,300 sq. ft. TPO Roof System
  • Completed 2010, 5,200 sq. ft. TPO Roof System
  • Completed 2011, 5,300 sq. ft. TPO Roof System
  • Completed 2013, 400 sq. ft. TPO Roof System
  • New construction
  • Occupied and operating manufacturing plant
  • Reflective Membrane
  • LEED accredited building
  • Included aerial work on high sloped roofs 120 ft. high
  • Limited access to roof areas
  • Included installation of roof coatings

Argo, New Hamburg

  • Completed 2016
  • 35,600 sq. ft. roof replacement
  • Built Up Roof System
  • Occupied and operating manufacturing plant
  • Included removal of multiple layers of roofing
  • Included steel deck repairs and replacement

Holiday Inn, Kitchener

  • Completed 2014
  • 7,400 sq. ft. roof replacement
  • Built Up Roof System
  • Operational hotel during roof replacement
  • Maintained public access